CETL (Capacity Emergency Transfer Limit) is the capability of the transmission system to support deliveries of electric energy to a given area experiencing a localized capacity emergency as determined in accordance with the PJM Manuals.

Source: https://www.pjm.com/Glossary.

Posts

PJM BRA 2023/24 Rule Changes and Auction Parameters: Capacity Price Forecast | Capacity Watch Blog

In ESAI’s latest Capacity Watch report, we analyze the three major rule changes that will impact pricing in the upcoming PJM Base Residual Auction (2023/24 BRA) and the subsequent influence on clearing prices out to 2030. These rule changes include FERC’s revised approval of ELCC, a default MSOC based upon Net ACR, and FERC’s failure to reach a majority decision on PJM’s proposed MOPR revisions.