PJM Power Prices Likely To Heat Up This Summer | Energy Watch Blog

ESAI Power’s summer forecast for power prices in PJM is bullish. Both Day-Ahead and Spot markets should see increased volatility due to stronger loads, robust gas prices, and generation retirements. In this blog, we’ll provide a preview into the ESAI Power Energy Watch bullish forecasts and expected generation changes that will impact energy prices in PJM, NYISO and ISO-New England. The upside potential for delivered natural gas and power prices across the Northeast will keep the ISO markets interesting in the upcoming months.

Higher Loads and Hotter Temps Drive Increased Electricity Demand in ISO New England, PJM & NYISO | Congestion Watch Blog

Electricity demand will increase in June as temperatures rise and higher loads become the main driver for ISO New England, PJM and NYISO. Generator maintenance will no longer be a major factor in June. The power generation maintenance season will largely be completed by the end of May, and outage levels will be minimal throughout the summer. Significant transmission work continues in ISO New England, PJM and NYISO.

Net Zero by 2050 Emissions Reduction Mandates in New England | Emissions Watch Blog

In today’s blog, we’re providing an excerpt from a recent preview to our next Emissions WatchTM that discusses two new Net Zero by 2050 emissions reduction mandates that were recently signed into law in New England. In Massachusetts, Governor Charlie Baker signed An Act Creating a Next Generation Roadmap for the Massachusetts Climate Policy. Rhode Island Governor Dan McKee signed a Landmark Act on Climate into law on April 10, 2021. Like the Massachusetts Act, it establishes specific emissions reduction mandates.

Increased Electricity Demand in PJM, NYISO & ISO-New England | Congestion Watch Blog

Planned generator maintenance across the Northeast region will wind down during May and will largely be completed by the end of the month. Outage-driven congestion will shift to load-driven congestion as higher daytime temperatures increase electricity demand in PJM, NYISO, and ISO-New England. All three Northeast ISOs have scheduled significant transmission work throughout May. In New England, longer-term transmission outages will increase congestion in NEMA, RI, and SEMA.

Energy Watch™ Report Released for Q1 2021

In this report, we cover load developments and their impact on wholesale electricity prices in NYISO, PJM, and ISO-New England. In most areas of New York, 2021 energy demand is projected to be down slightly. PJM’s 2021 Load Report projects energy demand for 2021 to be 1.2 percent lower than in the 2020 Load Report. In New England, higher projected energy efficiency and distributed solar growth are expected to offset increases in demand from electric vehicles and space heating.

Energy Demand in NYISO, PJM, & ISO-New England and How They Impact Wholesale Electricity Prices | Energy Watch Blog

Based upon changes in demand, we produce analysis and a price forecast to predict wholesale electricity prices in NYISO, PJM and ISO-New England. This week’s Energy Watch report provides an overview of load developments and a 10-year price forecast for each of the Northeast regions. In most areas of ISONY, 2021 energy demand is projected to be down slightly. Longer-term projections under the preliminary 2021 NYISO Gold Book are lower than the 2020 Gold Book projections.

PJM BRA 2022/23, ISO-NE FCA 16 Forecast and NYISO Capacity Price Forecast | Capacity Watch Blog

Our Q1 Capacity Watch™ provides clients with an in-depth outlook on PJM, ISO-New England and NYISO Capacity prices. For ISO New England, we review the results for the Fifteenth Forward Capacity Auction (FCA15) recently conducted by ISO New England. In PJM, parameters have been released for the 2022/23 BRA, scheduled for May 2021. With a lower forecasted peak load, auction clearing prices are expected to decline in all PJM locations. In New York, the 2021 Summer Capability Period will begin in May.

Capacity Watch™ Report Released for Q1 2021

Our Q1 issue of Capacity WatchTM came out this week. In this issue, we’re covering results from ISO-New England FCA15 and an outlook for FCA16. In PJM we’re forecasting the BRA clearing prices expected in the upcoming capacity auction. For NYISO, due to a lower forecasted peak load and a drop in the Locational Capacity Requirement (LCR), prices are expected to decline substantially for New York City.

Transmission Watch™ Report Published for Q1 2021

In today’s Transmission WatchTM report, ESAI Power analysts assess the NYDPS report on the power grid mandated by the Accelerated Renewable Energy Growth and Benefit Act. Our analysis looks at the need for coordination between renewables and energy storage deployment. This will have implications on the competitive market structure in the NYISO.

Need Coordination Between Renewables and Energy Storage Deployment in NYISO | Transmission Watch Blog

In our latest Transmission Watch report, we identify the need for coordination between renewables and energy storage development in NYISO.  ESAI’s analysts take an in-depth perspective on the New York Department of Public Services (NYDPS) initial report on the Power Grid to the New York Public Service Commission (NYPSC) in January. This Power Grid Study was mandated by the April 2020 Accelerated Renewable Energy Growth and Community Benefit Act. This study seeks to identify transmission investments that are necessary to achieve climate goals under New York’s July 2019 Climate Leadership and Community Protection Act (CPCLA).